Preliminary Column Sizing to Eurocode 2

Pick column dimensions early and with confidence. Quick Structural works out the effective length, the stocky column limit, the cover and the structural class, then records every step in a report.

What the column sizing tool does

The column sizing report finds the structural class and concrete cover, then checks the dimensions against Eurocode 2 clause 5.8.3.1. It works out the effective length from the clear height, and uses the limit for stocky columns to set the smallest section that avoids slenderness effects.

Example: column with a 3.0 m clear height

These are the inputs and results from the report shown below. Column 1 uses C30/37 concrete and 16 mm bars.

ConcreteC30/37 (fck = 30 N/mm²)
Reinforcement diameter16 mm
Exposure class and design lifeXC1, 50 years
Structural classS3
CoverCmin,dur 10 mm, Cmin,b 16 mm, nominal 26 mm, adopted 30 mm
Clear height3000 mm
Effective length1770 mm (factor 0.59)
Stocky column limitEffective length / h of 15 or less, so h is 118 mm or more
Adopted sectionb = 300 mm, h = 300 mm

A real preliminary column design report

This is the report exactly as Quick Structural produces it. Each row gives the Eurocode 2 reference, the calculation and the output.

Open the full report as a PDF

Frequently asked questions

What is a stocky column?

A stocky column is one that is short enough, compared with its section, that second order effects can be ignored. The report uses the limit from Eurocode 2 clause 5.8.3.1.

How is the effective length found?

It is the clear height multiplied by an effective length factor, which depends on how the column is restrained at each end.

Is the adopted section final?

No. It is a starting size. The column design then checks axial load and bending in full.

Can I size slabs, beams and footings the same way?

Yes. Each element has its own preliminary sizing report.

Can I rely on the results for a real building?

Quick Structural is a design aid. Every design should be checked and approved by a qualified, registered engineer before it is used for construction.